Turn a park’s electricity
into a plannable asset
Novarc provides energy assessments, modular storage configuration and operations planning for commercial parks. It starts with an honest data review, so every kilowatt-hour can be explained.
For existing parks and new builds. The assessment starts without changing your current distribution architecture.
SOC
68%
PCS
500 kW
MODULES
× 4
3 stages
Assess · Configure · Operate
2 markets
China · UAE
1 curve
Every decision starts with load
From meter to dispatch, on one diagram
We split storage into four layers, with traceable inputs, outputs and ownership at each level. On delivery, this diagram becomes the shared language for acceptance and operations.
Metering
15-minute load and demand data
Energy management
Tariff, demand and backup logic
Power conversion
Charge and discharge by circuit
Operations
Alarms, work orders, monthly review
Illustrative method only. The actual topology follows site electrical conditions and grid-connection review.
Three services around the same load curve
No generic equipment quote. We read the data first, then decide whether storage is needed, how much, and where it belongs.
Energy assessment
Map meters, load structure and tariff components into a reproducible baseline, and identify the hours genuinely worth changing.
Storage configuration
Size capacity, power and connection points from the baseline, with a module combination, grid boundaries and a staged expansion path.
Operations planning
Turn design assumptions into inspections, alarms and review routines so the system still performs in year three.
From the first data review to grid-connected operation
Every stage has a defined output and decision point. You can stop and reassess at any time.
Energy baseline
Collect 30+ days of metering data and confirm load behaviour and tariff structure.
Configuration
Provide capacity and power ranges, connection locations and investment boundaries, with uncertainties flagged.
Delivery
Coordinate electrical and civil conditions, then complete commissioning and pre-connection checks.
Operations review
Test design assumptions against real operation and adjust strategy each quarter.
Expand as needed, not all at once
One cabinet runs independently; additional cabinets run in parallel. Configure for today’s load, then add capacity as the park grows instead of paying upfront for a peak years away.
- Capacity per cabinet
- 215 kWh
- Expansion
- Parallel cabinets
- Design life
- ~15 years
- Monitoring
- Cabinet / circuit level
- Cabinet and power unit are separated so maintenance does not stop the whole system
- Supports switching between grid-connected and backup operation modes
- Communication and metering interfaces reserved for existing energy platforms
Method, projects and market notes
Notes from our assessments and operations reviews, plus what is changing in China and the UAE.
No articles published yet
We will update this page when new assessment notes or market observations are ready.
Read the load before sizing the capacity
A structured assessment buys you a configuration conclusion you can actually verify.